Union Worx IBEW Local 529

Mosaic, Colonsay Mine - 1 (One) JM - RSE - With $100/d Incentive

Long Call

Contractor: Absolute Green Limited
Site: Mosaic Colonsay
Start: ASAP
Duration: long term
Shift: 4/10s - Monday to Thursday, every other Friday
Hours: 10 hours / day
Travel: daily travel (less 30 km free zone)
LOA: No
Contract: Provincial collective agreement
**The Contractor will provide a bonus incentive of $100 per day **

Description of Work: work scope covers the tracing and removal electrical cables containing polychlorinated biphenyls (PCB) at the Mosaic Colonsay mine site. Some cables are already disconnected whilst in service PCB cables would be traced and documented.

Requirements for dispatch:
1. Clear pre-access alcohol & drug test (to be coordinated by Contractor)
2. Qualified Electrical Worker
3. Ariel Work Platform
4. SCSA - SCOT
5. CODC - Rights & Responsibilities
6. General Mine Safety Awareness (to be provided by Contractor)

Requirements: GMSA - General Mine Safety Awareness QEW - Qualified Electrical Worker Aerial/Mobile Work Platform - Second Side SCOT - Safety Construction Orientation Training INCLS WHMIS Rights & Responsibilities - CODC
Contractor Absolute Green Limited
Classifications Local
Call Date 10/14/2026

BHP Jansen - Oct 14 - 2026, 2 RSE JM

Long Call

Located in Saskatchewan, Canada, production at Jansen is expected to begin in mid-2027. Once fully ramped up, Jansen will become one of the world's largest potash mines, producing approximately 8.5 million tones per annum (Mtpa).

CAMP JOB
Start: Oct 20 in camp - Oct 21 Orientation 730am
Duration: approx 14 days ---- SHORT TERM CALL
Shift: 12 Hrs./day, 6am - 630pm
Rotation: 1 shift 14 days (+ or -)
Contract: Jansen PLA (available in Union Worx)

Bussing will be provided from Saskatoon. Driving may also be available - arrange through SEC
Work is outside and building will not be heated.
Install cables, field tray, junction boxes and terminations. Work is in Loadout

Fall Pro & AWP, SCOT, R&R

10 PANEL DNA PRE ACCESS - Lab Based

Requirements: Red Seal Card /Journeyman Fall Protection Saskatchewan Electrical Licence SCOT - Safety Construction Orientation Training INCLS WHMIS Rights & Responsibilities - CODC
Contractor SEC - Southeast Construction L.p.
Classifications Local
Call Date 10/14/2026

BHP Jansen - Oct 14 - 2026, 1 APP - any level

Long Call

Located in Saskatchewan, Canada, production at Jansen is expected to begin in mid-2027. Once fully ramped up, Jansen will become one of the world's largest potash mines, producing approximately 8.5 million tones per annum (Mtpa).

CAMP JOB
Start: Oct 20 in camp - Oct 21 Orientation 730am
Duration: approx 14 days ---- SHORT TERM CALL
Shift: 12 Hrs./day, 6am - 630pm
Rotation: 1 shift 14 days (+ or -)
Contract: Jansen PLA (available in Union Worx)

Bussing will be provided from Saskatoon. Driving may also be available - arrange through SEC
Work is outside and building will not be heated.
Install cables, field tray, junction boxes and terminations. Work is in Loadout

Fall Pro & AWP, SCOT, R&R

10 PANEL DNA PRE ACCESS - Lab Based

Requirements: Fall Protection SCOT - Safety Construction Orientation Training INCLS WHMIS Rights & Responsibilities - CODC
Contractor SEC - Southeast Construction L.p.
Classifications Local
Call Date 10/14/2026